In March 2018 a survey was conducted of the technical condition of the building structures of existing buildings of feedlot for overhaul with inventory number 644 / S-47408 (S-947.3 m2), inventory number 644 / S-47407 (S-1029.4 m2). On the basis of technical conclusions, it was decided to dismantle the buildings of feedlot for overhaul.
View the embedded image gallery online at:
http://solsm.by/en/news/34-the-death-of-the-capital-structure#sigProId37f76f4329
http://solsm.by/en/news/34-the-death-of-the-capital-structure#sigProId37f76f4329
View the embedded image gallery online at:
http://solsm.by/en/news/34-the-death-of-the-capital-structure#sigProIdb9212da4d4
http://solsm.by/en/news/34-the-death-of-the-capital-structure#sigProIdb9212da4d4